Documents
Nr. | Title | Category | Download |
---|---|---|---|
ENSI-AN-10960 | 2020 ENSI Oversight Report – ENSI-AN-10960 | Annual reports, Oversight Reports | PDF (5.15 MB) |
ENSI-AN-10650 | 2019 ENSI Oversight Report – ENSI-AN-10650 | Annual reports, Oversight Reports | PDF (6.20 MB) |
BET/17/0117 | Topical Peer Review 2017: Ageing Management at the Leibstadt Nuclear Power Plant | Reports | PDF (1.13 MB) |