Oversight Report 2023 – ENSI-AN-11888
For 2023, ENSI assessed the safety status of the nuclear power plants as good, an indication that the operation of Swiss nuclear installations complied with all statutory nuclear safety regulations. Emissions of radioactive material into the environment via waste water and exhaust air from nuclear installations were significantly below the allowed limits. The safety of people and the environment was ensured at all times. ENSI draws this conclusion in its 2023 Oversight Report.
The original language of the report is German. The executive summary is translated into English.