Beznau Nuclear Power Plant

Type: Pressurised water reactor

Start of commercial operations: 1969/1972

Nominal thermal output of each reactor: 1130 MW

Gross electrical output: 380 MWe

Net electrical output: 365 MWe

 

Click here for NPP Beznau

News

The Swiss Federal Nuclear Safety Inspectorate (ENSI) requires the Beznau nuclear power plant to provide proof that the reactor pressure vessel is safe. In an interview, Georg Schwarz, the Director of the Division for Nuclear Power Plants and Deputy Director of the ENSI, explains the importance of carrying out an ultrasonic examination.

Read more

The Swiss nuclear power plants (NPP) Beznau and Gösgen are required to perform standardized safety reviews of the base materials in their reactor pressure vessels to check for possible manufacturing flaws. Through this requirement, the Swiss Federal Nuclear Safety Inspectorate ENSI is implementing a recommendation issued by the Western European Nuclear Regulators Association (WENRA).

Read more